1. Beam induced heat load instrumentation installed in LHC during the Long Shutdown 2. Issue 1 (1st May 2022) Authors: Bradu, B; Brodzinski, K; Casas-Cubillos, J; Delikaris, D; Deschamps, J B; Le Naour, S; Pezzetti, M; Tavian, L; Tovar, A; Sisti, M; Ph Tock, J; Vauthier, N Journal: IOP conference series Issue: Volume 1240:Issue 1(2022) Page Start: Record Type: Journal Article View Content: Available online (eLD content is only available in our Reading Rooms) ↗