1. Primary control reserve of electric power by feedwater flow rate change through an additional economizer – A case study of the thermal power plant "Nikola Tesla B". (15th March 2018) Authors: Stevanovic, Vladimir D.; Ilic, Milica; Djurovic, Zeljko; Wala, Tadeusz; Muszynski, Slawomir; Gajic, Ivan Journal: Energy Issue: Volume 147(2018) Page Start: 782 Record Type: Journal Article View Content: Available online (eLD content is only available in our Reading Rooms) ↗